Proper storage procedures are essential for preserving the condition and performance of Large Generator Set during periods of inactivity.
Visual Inspection RoutineBegin each maintenance session with a thorough visual examination of the large generator set. Check for:
Fluid leaks (oil, fuel, coolant)
Loose electrical connections
Physical damage to components
Proper ventilation around the unit
Fluid Level ChecksVerify all critical fluid levels meet manufacturer specifications:
Engine oil (check when cold)
Coolant reservoir
Fuel supply
Battery electrolyte (if applicable)
Operational TestingConduct brief operational tests for Large Generator Sets:
Start the large generator set and observe startup characteristics
Monitor voltage and frequency stability
Check for unusual noises or vibrations
Verify proper exhaust emissions
Filter Condition AssessmentInspect key filtration systems:Air filters for blockage
Fuel filters for contamination
Oil filters for proper sealing
Battery MaintenanceFor battery-powered large generator sets:
Check terminal connections
Clean corrosion if present
Verify charge state
Test starting capability
Cooling System VerificationEnsure proper cooling system function:
Inspect radiator/fan operation
Check hoses for cracks or leaks
Verify coolant circulation
Documentation PracticesMaintain detailed records of:
Maintenance performed
Operational hours
Fluid consumption rates
Any abnormalities observed
Safety System ChecksTest critical safety features:Automatic shutdown systems
,Overload protection,Emergency stop functionality.
The article provides comprehensive storage guidelines for Huaquan generator sets.It covers various storage durations and environmental conditions without focusing on technical specifications. Following these practices will help maintain equipment readiness and prevent common storage-related issues.
More information about Huaquan Power:http://www.fadianjidl.com/